Your GovernmentCommunity ServicesDoing BusinessExplore Cibolo
How Do I?
Click to Home
Go To Search
Do I need an inspection when the shed is completed?
Yes. If the shed is portable you will call for an inspection once the shed has been completed. If the shed is on a permanent foundation; there will be 2 (two) required inspections – 1) pre-pour (prior to pouring your concrete) and 2) once the shed has been completed. Contact our office at 658-4175 to schedule a final inspection.

Building Inspections/Permits

Show All Answers

1. Do I need a permit to build a shed in my backyard?
2. What are the setbacks for a shed?
3. Do I need an inspection when the shed is completed?
4. How long does it take to get the shed permit?
5. What permits, if any, can be issued without a plan review?
6. Do I need a permit to pour a patio or build a deck?
7. What are the requirements for flat-work?
8. Do I have to permit to replace my hot water heater?
9. Do I need a permit to replace my AC conditioner / heater?
10. Can I do my own electrical / plumbing work?
11. Do I have to permit remodel work?
12. What type of work does not require a permit?
13. Can I install my own irrigation system?
14. Is drip irrigation required?
15. Do I need a permit to install / replace a fence?
16. Do I need an inspection when the fence is completed?
17. If I need an emergency installation of a water heater or A/C unit; do I need to wait until the contractor can get a permit?
18. Does the City of Cibolo require contactors to register?
19. What if I start work without a permit? (as a homeowner)
20. If I want to register as a contractor; what are the requirements?
21. Are there penalties for starting work without a permit?
22. Do I need a garage sale permit in the City of Cibolo?