What is the contact number / location of the Planning & Engineering office?

Planning & Engineering Department includes: •Planning & Zoning •Code Enforcement •Building Permits & Inspections Office Hours: Monday – Friday, 8am to 5pm Phone No: 210-658-4175 Fax No: 210-658-8065 Address: 200 S. Main Street P.O. Box 826 Cibolo, Texas 78108 Inspection Times: 9am to 12pm and 1pm to 4pm. No set appointment times. Homeowners may request an AM or PM inspection if the inspector needs to enter the home to complete the inspection (which includes the garage).

Planning & Engineering Department Front Office is closed for lunch daily from 11a.m. to 12p.m.  Inspector Lunch Hour 12p.m. to 1p.m. (may vary occasionally)


Show All Answers

1. What is the contact number / location of the Planning & Engineering office?
2. What permits, if any, can be issued without a plan review?
3. Are permits required for roofing?
4. Do I need a permit to build a shed in my backyard?
5. What are the setbacks for a shed?
6. Do I need an inspection when the shed is completed?
7. How long does it take to get the shed permit?
8. Is a permit required for pools (above / in ground) hot tub / spa?
9. What are the requirements for an above ground pool?
10. What are the setback requirements for an in ground pool?
11. Is a separate permit required for installation of propane tanks to heat the in ground pool?
12. Do I need a permit to pour a patio or build a deck?
13. What are the requirements for flat-work?
14. Do I have to permit to replace my hot water heater?
15. Do I need a permit to replace my Air Conditioner / Heating System?
16. Can I do my own electrical / plumbing work?
17. Do I have to permit remodel work?
18. What type of work does not require a permit?
19. Can I install my own irrigation system?
20. Is drip irrigation required?
21. Do I need a permit to install / replace a fence?
22. Do I need an inspection when the fence is completed?
23. If I need emergency work done on the weekend or after business hours; do I need to wait until the contractor can get a permit?
24. Does the City of Cibolo require contactors to register?
25. What if I start work without a permit? (as a homeowner)
26. If I want to register as a contractor; what are the requirements?
27. Are there penalties for starting work without a permit?
28. Do I need a garage sale permit in the City of Cibolo?