Yes. If building a concrete patio / wood deck, a permit is required. If hiring a contractor, the contractor must apply for the permit.Please note, no permit will be issued which will exceed the allowable impervious coverage amount for any lot. Impervious coverage is any hard surface / man-made area that does not readily absorb or retain water. Please contact City staff for information.
Following are requirements for submittal (include, but may not be limited to):
• Miscellaneous Permit Application (available at City Hall or on the City website)
• Material list
• Site plan showing proposed location, distances from property lines
• Detail frame drawing (deck)
• Copy of contract (if hiring contractor)
A minimum of 3 to 5 business days is required, although, plan review time may vary depending on workload and availability to accomplish a review.